top of page
Sunol Corporation Yard Improvements

Client: Port of San Francisco

​

Description

Subcontracting to SJ Amoroso Construction our work included the installation of two large 20,000 gallon holding tanks which required large, shored excavations. The tanks were installed in sections using two excavators to position each section. Tanks were sealed using joint sealant and mortar. 

​

We also installed over 2000 feet of ductile iron water pipe to supply all newly constructed buildings. Existing lines were hot tapped and connected to new fire hydrants as part of the fire protection scope. New backflow preventers were installed on the building fire water supply lines to meet the requirements of the latest fire protection code.

​