GBAS Infrastructure
Client: San Francisco International Airport
Contractor: Fontenoy Engineering
Project Value: $3.5M
Project Overview:
This project involved the construction of the infrastructure of a new Ground Based Augmentation System (GBAS) within the Airfield Operations Area located north of Runway 28R and east of Runway 19L.
It also included installing underground electrical and communication infrastructure, antennas, and an equipment shelter to enhance airfield navigation capabilities.
Strategic Approach:
Infrastructure Installation:
-
Designed and installed underground electrical and communication systems to support GBAS functionality.
Equipment & Antenna Deployment:
-
Installed high-precision antennas and an equipment shelter to minimizing interference with existing airfield operations.
Regulatory Compliance:
-
Ensured full adherence to Federal Aviation Administration (FAA) requirements, environmental regulations, and strict safety protocols.