top of page
.jpg)
Airport Projects
Industrial Waste System Phase 2
Installation of 8,000 linear feet of Fusible PVC Industrial Waste Force Main, progressively increasing in size from 8 inches to 14 inches and was designed to transport industrial waste collected from six pump stations across the airport to the Mel Leong Treatment Plant.

bottom of page