Runway 28L Reconstruction

Client: San Francisco International Airport

​

Contractor: Golden Gate Constructors

​

Project Value:  $1M

​

Project Overview:

This project involved the removal and replacement of 18” and 21” storm drain systems, including aircraft-rated catch basins in the area of Runway 28L and adjacent taxiways.

To minimize disruption to the airport operations, crews worked around the clock during a shutdown period to meet the demanding schedule and ensure the timely reopening.

Fontenoy Engineering's Airport Project - Runway 28L Reconstruction SFO
Fontenoy Engineering's Airport Project - Runway 28L Reconstruction SFO
Fontenoy Engineering's Airport Project - Runway 28L Reconstruction SFO
Fontenoy Engineering's Airport Project - Runway 28L Reconstruction SFO

Strategic Approach:

Storm Drain System Replacement & Coordination:

  • Replaced 18” and 21” storm drain lines to support runway reconstruction.

  • Installed aircraft-rated catch basins to handle heavy airfield traffic.

​

24/7 Operations & Scheduling:

  • Accelerated work timeline to reduce airport downtime.

  • Managed multiple shifts for continuous progress.

​

Drainage System Performance & Compliance:​

  • Ensured compliance with FAA, environmental, and airport regulations.

  • Connected new drainage with existing airfield utilities.

Fontenoy Engineering Logo

Tel: 415 740-0268

Fax: 415 852-5472

Fontenoy Engineering,
3450 3rd Street, Unit 4D,
San Francisco,
CA 94124

©2025 Fontenoy Engineering Inc. All Rights Reserved.

bottom of page