Runway 28L Reconstruction
Client: San Francisco International Airport
​
Contractor: Golden Gate Constructors
​
Project Value: $1M
​
Project Overview:
This project involved the removal and replacement of 18” and 21” storm drain systems, including aircraft-rated catch basins in the area of Runway 28L and adjacent taxiways.
To minimize disruption to the airport operations, crews worked around the clock during a shutdown period to meet the demanding schedule and ensure the timely reopening.




Strategic Approach:
Storm Drain System Replacement & Coordination:
-
Replaced 18” and 21” storm drain lines to support runway reconstruction.
-
Installed aircraft-rated catch basins to handle heavy airfield traffic.
​
24/7 Operations & Scheduling:
-
Accelerated work timeline to reduce airport downtime.
-
Managed multiple shifts for continuous progress.
​
Drainage System Performance & Compliance:​
-
Ensured compliance with FAA, environmental, and airport regulations.
-
Connected new drainage with existing airfield utilities.