The construction of a reinforced concrete headwall for the outfall structure of a newly installed storm drain at Pier 94, designed to serve a redeveloped area and enhance stormwater management.
The installation of RCP storm drain lines, including 28 aircraft-rated catch basins and manholes. Additionally, existing storm drain lines and structures were removed.