North Point Outfall Rehabilitation Project
Client: Port of San Francisco
Contractor: Fontenoy Engineering
Project Value: $1.9M
Project Overview:
Installed custom-fabricated air vents on four 48-inch stormwater outfall pipelines beneath Piers 33 and 35.
Work included hoisting 16-inch epoxy-coated ductile iron pipes into place using scaffolding and floating platforms.
Marine-grade supports were anchored to the pier deck to ensure durability in a corrosive saltwater environment.
Strategic Approach:
Demolition & Protection:
-
Safely removed structures while preserving existing utilities and infrastructure.
Utility Relocation & Installation:
-
Relocated and upgraded wet utilities to meet project requirements.
Regulatory Compliance:
-
Ensured adherence to environmental and safety standards.