Terminal 1 Centre Renovation
Client: San Francisco International Airport
​
Contractor: Hensel Phelps
​
Project Value: $25M
​
Project Overview:
This project involved the installation of all new site utilities, including storm, sewer, water and industrial waste piping.
All systems were connected from the new Terminal 1 building to the existing systems.
This project also included the demolition and removal of existing utilities, demolition of the existing pump station and hardscape.
Structural excavation for basement areas and all concrete work was performed, along with grading of the project site in preparation for concrete work and subgrade preparation.






Strategic Approach:
​
Utility Installation & Coordination:
-
Managed sequencing to maintain uninterrupted airport operations.
-
Coordinated with stakeholders to prevent infrastructure disruptions.
​
Excavation & Subgrade Preparation:
-
Addressed soil conditions and underground obstructions.
-
Ensured proper compaction for long-term durability.
​
Demolition & Utility Removal:
-
Planned removals to avoid interference with adjacent utilities.
-
Executed efficiently to stay on schedule.
​
Testing & Quality Assurance:
-
Conducted rigorous testing to meet regulatory standards.
-
Verified alignment and slope before backfilling.
​
Pavement & Restoration:
-
Restored pavement to airport specifications.
-
Coordinated with airside and landside operations for seamless integration.