top of page

Courtyard 3 Connector

Client: San Francisco International Airport

Contractor: Hensel Phelps

Project Value: $8M

Project Overview:

This project involved site utility work, including potholing, utility location, installation of new utilities, structural excavation, and site grading.

It also required demolishing existing utilities and trenching for underground plumbing with coordination and phased execution being key to minimizing disruptions.

Strategic Approach:

Utility Locating & Installation:

  • Conducted potholing to identify and protect existing utilities.

  • Installed new site utilities with minimal operational impact.

Excavation & Site Preparation:

  • Performed structural excavation.

  • Graded the site in preparation for concrete slab.

Demolition & Utility Removal:

  • Removed outdated utilities while maintaining service continuity.

  • Managed demolition to stay on schedule and minimize disruptions.

Trenching for Electrical and Plumbing Subcontractors:

  • Excavated trenches to grade for underground plumbing.

  • Provided excavation services for electrical subcontractor, backfilled with concrete and structural fill.

Fontenoy Engineering Logo

Tel: 415 740-0268

Fax: 415 852-5472

Fontenoy Engineering,
3450 3rd Street, Unit 4D,
San Francisco,
CA 94124

©2025 Fontenoy Engineering Inc. All Rights Reserved.

bottom of page