Contractor: DeSilva Gates Construction


Project Value: $9.6M

Project Overview: 

This project involved demolishing existing structures and installing utilities to support the Potrero Power Station development.

Installation included a new domestic water system and recycled water system as well as an AWSS (Auxiliary Water Supply System) using Kubota pipe.

The Kubota ductile iron pipe used in the AWSS, is highly durable and corrosion-resistant that is ideal for high-pressure and seismic applications making it well-suited for emergency water systems.

Strategic Approach:

Demolition & Protection

  • Safely removed structures while preserving existing utilities and infrastructure.

Utility Relocation & Installation

  • Relocated and upgraded wet utilities to meet project requirements.

Regulatory Compliance

  • Ensured adherence to environmental and safety standards.

Fontenoy Engineering Logo

Tel: 415 740-0268

Fax: 415 852-5472

Fontenoy Engineering,
3450 3rd Street, Unit 4D,
San Francisco,
CA 94124

©2025 Fontenoy Engineering Inc. All Rights Reserved.

bottom of page